オレゴン州運輸省がポートランド LED 街路灯プロジェクトを完了

LED 照明アプリケーション - ニュースの表紙

この投稿を共有する

The Oregon Department of Transportation (ODOT) has completed an $18.9 million streetlight project in which more than 8,000 fixtures were replaced with energy efficient LEDs.

The streetlight conversion program was done in a partnership with renewable energy company Ameresco and replaced high-pressure sodium lighting fixtures across the Portland area. Lighting was also upgraded in 13 tunnels.

The LED streetlights are dark-sky friendly and use 50% less energy than traditional highway lighting, Ameresco says. The overall project will reduce carbon emissions by an estimated 3,500 metric tons a year.

The lights have a lower color temperature compared with previous lighting, which means they won’t have to be replaced for 15 に 20 年, Ameresco says. The older, high-pressure lights lasted two to four years.

ODOT says the project will save on maintenance costs and is part of its commitment to reduce carbon emissions through renewable technologies.

According to the Climate Group, lighting accounts for up to 5% of the world’s carbon emissions, and public lighting accounts for 20% に 40% of a municipality’s electric bill. A switch to LED lighting can cut energy costs by as much as 70%.

Switching to all LED lighting would also save 735 million tons of carbon emissions worldwide, according to the Climate Group, and up to $6 billion in energy costs in the United States alone.

Similar programs as the one in Oregon have taken place across the country. In New York, the Smart Street Lighting NY program has replaced 300,000 streetlights throughout the state with LEDs with a goal to replace at least 500,000 through 2025.

In Chicago, より多い 280,000 streetlights have been converted to LEDS, which will save $100 million in electricity costs over the next 10 年, the city says. Ameresco has also been a part of similar projects in Oregon, helping Medford update 8,000 public lighting fixtures.

ODOT and Ameresco worked to develop a plan that minimized traffic and safety concerns while meeting design standards. Ameresco also worked with Mobility Advisor Committee to complete the project.

Construction began on the ODOT project in May 2020 and was completed in December 2021.

もっと探検する

中国 (メキシコ) ブランド共同博覧会をエクスポートします

メキシコにご参加ください

during私たちはあなたが今後の中国でレイディシーンを訪問するように招待してうれしいです (メキシコ) ブランド共同博覧会をエクスポートします! ✨日付: 9月 2 -

Lightning ソリューションの最新の市場価格と優位性を知りたい?

私たちに連絡して連絡を取り合いましょう

Factory News-BG02

簡単な見積もりを取得

内で対応します 12 時間, 接尾辞が付いたメールに注意してください 「@laidishine.com」.

また, あなたは行くことができます お問い合わせページ, より詳細なフォームを提供します, 製品の詳細をお持ちの場合、または交渉済みの軽いソリューションを取得したい場合.

データ保護

データ保護法を遵守するため, ポップアップの重要なポイントを確認してください。. 引き続き当社ウェブサイトをご利用いただくには, 「同意する」をクリックする必要があります & 近い'. 当社のプライバシーポリシーについて詳しく読むことができます. 当社はお客様の同意を文書化します。当社のプライバシー ポリシーに移動してウィジェットをクリックすることでオプトアウトできます。.